CASE STUDY
-
Checking for Transducer Malfunctions
Situation
[Japan] When testing transducers (convertors) in a distribution board, there are cases where the central monitoring system cannot be started up. In such situations, the output wiring of the transducer was disconnected and a digital multimeter was connected for measurement. Similarly, when abnormal readings appeared on the central monitoring system on a board in operation, disconnecting the transducer output wiring during operation posed a high risk. Therefore, transducer testing was carried out during scheduled power outages to check for any malfunctions.- DC MILLIAMP CLAMP LOGGER
- NEW
- Renovation
- Work efficiency
- Inspection
More details
-
Working time decreased by approximately 40%
Situation
[Japan] For electrical installation inspections, we had to carry both a simplified earth resistance tester and a low-voltage insulation resistance tester, leaving both hands occupied.- INSULATION EARTH TESTER
- NEW
- Work efficiency
- Inspection
More details
-
Single tester provides versatile tests: contributes to increase working efficiency
Situation
【Japan】 Many types of testers are necessary to check insulation and leakage current etc. at the inspection of electrical tools and cable reels. One comprehensive tester which can reduce working time and increase working efficiency is ideal. In terms of management, saving and recording of measurement result is also the key feature.- PORTABLE APPLIANCE TESTER
- Work efficiency
- Inspection
More details

